Guide to Estimating for Vacuduct
Systems
- To calculate number of inlet valves. The
cleaning hose is 10 Mtr long, so working from a scale plan (1:50)
take a piece of cord 18 cm long and establish positions for inlets.
Plan the position of inlets with care, basing your selection on
how far the hose (cord) will reach. Remember that it will need
to reach all corners working around the furniture. Avoid positioning
inlet valves behind doors etc. Mark inlet on plan and repeat until
all floor area can be reached from one or other inlet positions.
Central positions such as under the stairs are excellent.
- Repeat for each floor of house. Inlet valves
can be mounted either on solid walls with the ducting running
up back side of wall. (Hint, inside cupboards is a useful place
to run the ducting) or with stud timber walls ducting can be run
up between studs. Ideally, 1st floor inlets are positioned directly
above ground floor inlets to minimise ducting and bends required.
- The power unit can be located in the garage,
utility room or any out of the way cupboard, but preferably where
access is good to allow for periodic emptying. If located inside
the house the exhaust from the machine will need to be vented
to outside and if fitted in a cupboard allow for ventilation (i.e.
louvered doors) to ensure motor does not overheat.
- The 52 mm O/D rigid PVC ducting will be
run from the power unit to the inlet positions. It is usual to
have one main run with branches off to the various inlet positions.
Mark position of ducting on plan and ensure that all inlets are
connected to power unit.
- Note number of inlet valves required in
table below. If a Vacpan for the kitchen is required then allow
for an additional inlet kit. Then measure all vertical and horizontal
duct runs to calculate TOTAL DUCTING quantity. Add 10% to allow
for wastage.
Once you have calculated the number of
inlets required and decided on the position of the power unit fill
in the table below. We allow for 5 Mtrs of ducting per inlet so
under DUCTING REQUIRED fill in your total quantity required.
Subtract ducting required from ducting included (in column 2) and
fill in ADDITIONAL DUCTING REQUIRED, if needed.
To price system simply fill in the order form (page 7), then fax
us or phone and leave the rest to us. We will ensure that you are
supplied with all the materials you require. Tel 0800 783 6264 or
fax on 01544 388087.
 |
| Vacpan
Required Yes/No |
Inlet
Required INC. Vacpan |
Ducting
Included |
Ducting
Required |
Additional
Ducting To
Order |
Power
Unit To Order |
Hose
Set Required |
| Yes |
Example
5 Inlets |
25
Mtrs |
35 |
10 |
AE2500 |
1 |
| . |
1 |
5 |
. |
. |
AE1500 |
1 |
| . |
2 |
10 |
. |
. |
AE1500 |
1 |
| . |
3 |
15 |
. |
. |
AE1500 |
1 |
| . |
4 |
20 |
. |
. |
AE2500 |
1 |
| . |
5 |
25 |
. |
. |
AE2500 |
1 |
| . |
6 |
30 |
. |
. |
AE2500 |
1 |
| . |
7 |
35 |
. |
. |
AE2500 |
1 |
| . |
8 |
40 |
. |
. |
AE2500 |
1 |
| . |
9 |
45 |
. |
. |
AE2630 |
1 |
| . |
10 |
50 |
. |
. |
AE2630 |
1 |
| . |
11 |
55 |
. |
. |
AE2630 |
1 |
| . |
12 |
60 |
. |
. |
AE3200 |
1 |
| . |
13 |
65 |
. |
. |
AE3200 |
1 |
For each additional inlet simply
allow 5 Mtrs of ducting per inlet kit. When you order 0204M we include
ducting plus fittings, extra wire and cable ties required.
Ready Reckoner
For more information on how to fill in the ready reckoner form please click here
|